Call Us 631.267.8688

March 2017

The culvert passing under Gerard Dr into the north end of Accabonac harbor has been cleared of silt and sediment.

The East Hampton Trustees had the inlet of Accabonac harbor dredged from Louse Point using a long-arm excavator from Bistrian, the town’s preferred contractor of 2017. The sand was moved down and spread on public land to nourish the beach to the southeast.

Leave a Comment